Wuxi Huarun Gas Co after nearly a month of intense construction, design size of 100000 cubic meters, the first LNG is located in the Wuxi new area receiving gasification station successfully put into operation, which, by my company to provide Wuxi Huarun Gas Co 8 2500NM3/h air heated vaporizer and 2 sets of 10000NM3/h circulating water heater NG from contract to delivery production took only 25 days, such a fast speed of delivery, the first is in the LNG industry, won time for Huarun, Huarun company successfully completed task gas transformation City Hall issued at the same time, made great contribution to the people of Wuxi. The formal use of more than 3 months, all the normal operation of equipment, have reached or exceeded the design requirements.
|